The future of Clark County air travel looks brighter than ever

Oct 28, 2024 | Airport Improvement

The Clark County Department of Aviation is excited to share plans for future improvements at Harry Reid International Airport, including terminal upgrades, better connectivity around the airport, and the Southern Nevada Supplemental Airport (SNSA). The plans include:

• Expanding Terminal 1 with the addition of 26 new gates;
• Designating Terminal 3 as Terminal 2;
• Balancing airlines at Terminal 2 to consolidate operations and reduce congestion at Terminal 1;
• Redesigning the second level of Terminal 2 with new ticketing and curbside self-bag-drop technology.

LAS roadway plans include:

• Terminal-to-terminal flyover roadway designed to support one-way circular motion of airport traffic circulation. This will improve vehicular movement and traffic safety by providing a separation from bypass commuter traffic.

Connectivity plans include:

• Constructing two multimodal centers to the north and south of LAS for ride share, public transportation options and parking for employees and crew.

The Southern Nevada Supplemental Airport (SNSA) is currently undergoing the Environmental Impact Statement (EIS) review process, with the next step being the issuance of the Notice of Intent by the Joint Lead Agencies, which are comprised of the Federal Aviation Administration and Bureau of Land Management.
For more information on SNSA, visit snsaproject.info and watch the video below.

Article Categories

Recent Press Releases

Recent Posts

Sign Up For Our Newsletter

* indicates required